
Another version of K5. Worked 1.5 days on it.
-------------------
INSTRUCTION
BIND KEYS
PLACE SHELL SCHEMATIC LIKE SHOWN ON PHOTO WHEN STOPPED AND TRAIN DISASSEMBLED
REMOVE GLUE FROM SCREW BREECH (DO NOT FORGET TO GLUE IT BACK WITH 1ST BLOCK OF BARREL WHEN ASSEMBLE TRAIN!)
CANNON CAN CONSUME ONLY 10 POWDER CHARGES!
--------------------
I'll hope you readed instruction, and checked the instuction photo. GL!
2TE10V?570 blocks · Railbuilder
Train Tracks Factory Vanilla Create151 blocks · Skyiom
sd40_2_white.nbt299 blocks · Sladetska
NongMetro A1 Train1,717 blocks · Thenong
Dog Train (Chew Chew)946 blocks · __Aimee
Double-Decker Control Car [V3]571 blocks · Mr.theniceguy
SP T-31 #2355204 blocks · Westwardmogul44
"Thunderbird" - Workshop on Rails735 blocks · Xkotoff
Steempunk Train1,000 blocks · Zornghost
CHME3259 blocks · Manccc58
Steam Train (Steamer)2,310 blocks · Richirich
BR Class 88435 blocks · Hoddey